| Moteur de recherche de fiches techniques de composants électroniques |
|
L9963E Fiches technique(PDF) 85 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
L9963E Fiches technique(HTML) 85 Page - STMicroelectronics |
|
85 / 184 page ![]() Depending on the wire length of the cell wires connected to the PCB, some inductive spikes might be seen when interrupting the balancing, prior to “Cells” step of the Voltage Conversion Routine. These spikes can be a source of inaccuracy, especially if Cx pins are filtered using high values for RLPF (e.g. 3 kΩ), requiring a relatively high settling time. It is possible to specify a settling time TCELL_SET by programming the T_CELL_SET SPI field. Upon Start Of Conversion (SOC) event, L9963E will wait for T_CELL_SET before starting the Voltage Conversion Routine. Such a settling time is only enabled if BAL_AUTO_PAUSE = 1. In order to keep synchronization with the Coulomb Counting Routine, the Cells step might be additionally delayed in order to align with the first useful current sample. In the worst case, the total delay is T_CELL_SET + TCYCLEADC_CUR. The VTREF regulator is normally used for temperature sensing applications, involving the GPIO steps of the routine. To save current, it can be dynamically enabled only when needed, according to the following table: Table 55. VTREF operating modes VTREF_EN VTREF_DYN_EN VTREF Regulator behavior 0 0 (Default). VTREF regulator disabled 0 1 VTREF regulator disabled 1 0 VTREF regulator permanently enabled 1 1 VTREF regulator dynamically enabled. The regulator is normally OFF. It is enabled at each Start Of Conversion (SOC) event (either on-demand or cyclic), with a settling time TCELL_SET in respect to the Cells step of the Voltage Conversion Routine. The regulator is kept enabled until the last step of the routine (HWSC) has been performed. Due to flexibility, routine execution time TROUTINE is not fixed. It depends on the programmed voltage acquisition window (either ADC_FILTER_SOC or ADC_FILTER_CYCLE depending on the conversion type) and the number of steps scheduled for execution (see Section 4.12.4 Operations periodicity). Voltage conversion routine duration TROUTINEMIN=2TCYCLEADC , wℎen only mandatory cℎecks are executed TROUTINEMAX=4TCYCLEADC+ 5TCYCLEADC_000+2TBAL_OL+2TCxOPEN_SET+TGPIO_OPEN_SET, wℎen all cℎecks are executed (14) L9963E Voltage conversion routine DS13636 - Rev 12 page 85/184 |
|
Lien URL |
| ALLDATASHEET vous a-t-il été utile ? [ DONATE ] |
À propos de Alldatasheet | Publicité | Contactez-nous | Politique de confidentialité | Lien vers la fiche technique | Echange de liens | Fabricants All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |