| Moteur de recherche de fiches techniques de composants électroniques |
|
EVM-GPS-R4 Fiches technique(PDF) 5 Page - Linx Technologies |
|
|
|||||||||||||||||||||||||||||
EVM-GPS-R4 Fiches technique(HTML) 5 Page - Linx Technologies |
|
5 / 10 page ![]() – – – – 4 5 NC 1 NC 2 1PPS 3 TX 4 RX 5 GND 21 NC 6 1PPS 7 /RESET 8 RFPWRUP 9 ON_OFF 10 GND 20 RFIN 19 GND 18 VOUT 17 NC 16 GND 22 NC 15 NC 14 NC 13 VCC 12 VBACKUP 11 Figure 5: R4 Series GPS Receiver Pinout (Top View) Figure 6: R4 Series GPS Receiver Pin Descriptions Pin Assignments Pin Descriptions Pin Descriptions Pin Number Name I/O Description 1, 2, 6, 13, 14, 15, 16 NC − No electrical connection. 3, 7 1PPS O 1 Pulse Per Second. 1.8V level. 4 TX O Serial output (default NMEA) 5 RX I Serial input (default NMEA) 8 /RESET I Reset input, active low. The module has an internal power-on reset circuit so this pin can be left floating 9 RFPWRUP O Power State Indicator. 1.8V level. 10 ON_OFF I Power Control Pin. If this pin is not used, leave it floating. 11 VBACKUP P Backup battery supply voltage. This line must be powered to enable the module. 12 VCC P Supply Voltage 18, 20, 21, 22 GND P Ground 17 VOUT O VCC voltage to supply an active antenna. 19 RFIN I GPS RF signal input A Brief Overview of GPS The Global Positioning System (GPS) is a U.S.-owned utility that freely and continuously provides positioning, navigation, and timing (PNT) information. Originally created by the U.S. Department of Defense for military applications, the system was made available without charge to civilians in the early 1980s. The global positioning system consists of a nominal constellation of 24 satellites orbiting the earth at about 12,000 nautical miles in height. The pattern and spacing of the satellites allow at least four to be visible above the horizon from any point on the Earth. Each satellite transmits low power radio signals which contain three different bits of information; a pseudorandom code identifying the satellite, ephemeris data which contains the current date and time as well as the satellite’s health, and the almanac data which tells where each satellite should be at any time throughout the day. A GPS receiver receives and times the signals sent by multiple satellites and calculates the distance to each satellite. If the position of each satellite is known, the receiver can use triangulation to determine its position anywhere on the earth. The receiver uses four satellites to solve for four unknowns; latitude, longitude, altitude and time. If any of these factors is already known to the system, an accurate position (fix) can be obtained with fewer satellites in view. Tracking more satellites improves calculation accuracy. In essence, the GPS system provides a unique address for every square meter on the planet. A faster Time To First Fix (TTFF) is also possible if the satellite information is already stored in the receiver. If the receiver knows some of this information, then it can accurately predict its position before acquiring an updated position fix. For example, aircraft or marine navigation equipment may have other means of determining altitude, so the GPS receiver would only have to lock on to three satellites and calculate three equations to provide the first position fix after power-up. Client Generated Extended Ephemeris (CGEE) CGEE is a type of assisted GPS (AGPS) where the receiver uses the ephemeris data broadcast by the satellites to calculate models of each visible satellite’s future location. This allows the receiver to store up to 3 days worth of ephemeris data and results in faster TTFF. |
|
|
Lien URL |
| ALLDATASHEET vous a-t-il été utile ? [ DONATE ] |
À propos de Alldatasheet | Publicité | Contactez-nous | Politique de confidentialité | Lien vers la fiche technique | Echange de liens | Fabricants All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |