| Moteur de recherche de fiches techniques de composants électroniques |
|
EVM-GPS-R4 Fiches technique(PDF) 10 Page - Linx Technologies |
|
|
|||||||||||||||||||||||||||||
EVM-GPS-R4 Fiches technique(HTML) 10 Page - Linx Technologies |
|
10 / 10 page ![]() – – – – 14 15 GSV – GPS Satellites in View Figure 13 contains the values for the following example: $GPGSV,3,1,12,28,81,285,42,24,67,302,46,31,54,354,,20,51,077,46*73 $GPGSV,3,2,12,17,41,328,45,07,32,315,45,04,31,250,40,11,25,046,41*75 $GPGSV,3,3,12,08,22,214,38,27,08,190,16,19,05,092,33,23,04,127,*7B Mode 1 Values Value Description M Manual – forced to operate in 2D or 3D mode A Automatic – allowed to automatically switch 2D/3D Figure 13: GPS Satellites in View Example GPS Satellites in View Example Name Example Units Description Message ID $GPGSV GSV protocol header Total number of messages1 3 Range 1 to 3 Message number1 1 Range 1 to 3 Satellites in view 12 Satellite ID 28 Channel 1 (Range 01 to 196) Elevation 81 degrees Channel 1 (Range 00 to 90) Azimuth 285 degrees Channel 1 (Range 000 to 359) SNR (C/No) 42 dB-Hz Channel 1 (Range 00 to 99, null when not tracking) Satellite ID 20 Channel 4 (Range 01 to 32) Elevation 51 degrees Channel 4 (Range 00 to 90) Azimuth 077 degrees Channel 4 (Range 00 to 359) SNR (C/No) 46 dB-Hz Channel 4 (Range 00 to 99, null when not tracking. Checksum *73 <CR> <LF> End of message termination 1. Depending on the number of satellites tracked, multiple messages of GSV data may be required. Figure 12: Mode 1 Values RMC – Recommended Minimum Specific GPS Data Figure 14 contains the values for the following example: $GPRMC,053740.000,A,2503.6319,N,12136.0099,E,2.69,79.65,100106,,,A*53 Recommended Minimum Specific GPS Data Example Name Example Units Description Message ID $GPRMC RMC protocol header UTC Time 053740.000 hhmmss.sss Status A A=data valid or V=data not valid Latitude 2503.6319 ddmm.mmmm N/S Indicator N N=north or S=south Longitude 12136.0099 dddmm.mmmm E/W Indicator E E=east or W=west Speed over ground 2.69 knots TRUE Course over ground 79.65 degrees Date 100106 ddmmyy Magnetic Variation degrees Not available, null field Variation Sense E=east or W=west (not shown) Mode A A=autonomous, D=DGPS, N= Data not valid Checksum *53 <CR> <LF> End of message termination Figure 14: Recommended Minimum Specific GPS Data Example |
|
|
Lien URL |
| ALLDATASHEET vous a-t-il été utile ? [ DONATE ] |
À propos de Alldatasheet | Publicité | Contactez-nous | Politique de confidentialité | Lien vers la fiche technique | Echange de liens | Fabricants All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |